{
 "article": "BT-JP8",
 "title": "Japan cut its bridges needing repair by a quarter in seven years, but towns lag",
 "standard": "Tres Haciendas Sourcing Standard v2.1",
 "claims": [
  {
   "id": "k1",
   "kind": "sourced",
   "summary": "Bridges rated early or urgent (categories III and IV) were 69,051 of 716,466 inspected (10%) at the end of fiscal 2018, 56,463 of 723,552 (8%) at the end of 2023 and 51,046 of 725,525 (7%) at the end of 2025, each bridge counted by its latest inspection result; bridges more than 50 years after construction rose from about 130,000 to about 210,000 to about 240,000.",
   "see_also": [],
   "scope": "",
   "sources": [
    {
     "title": "橋梁等の2025年度（令和７年度）点検結果をとりまとめ ～道路メンテナンス年報（３巡目２年目）の公表～ (Results of the FY2025 inspections of bridges and other road structures, road maintenance annual report, third cycle year 2)",
     "issuer": "Ministry of Land, Infrastructure, Transport and Tourism, Road Bureau",
     "originator": "Ministry of Land, Infrastructure, Transport and Tourism, Road Bureau",
     "date": "2026-08-26",
     "url": "https://www.mlit.go.jp/report/press/content/002018446.pdf",
     "sha256": "cd8e4e9b002db3915e8b94076282183831e63caac21cd39eb635976095900a4e",
     "retrieved": "2026-11-22",
     "offline": "analysis/collection/japan-demographics/fetched-round-jrm2/originals/out/jrm-05.body",
     "s3": "s3://china-data-bulk-backup-229475225071/project-files-archive/analysis/collection/japan-demographics/fetched-round-jrm2/originals/out/jrm-05.body",
     "tier": "primary",
     "access": "firsthand",
     "retrieval": "read-in-archive",
     "capture": "original",
     "quote_lang": "ja",
     "assessment": "The ministry's own press release and attached slides announcing the annual road maintenance report for fiscal 2025 (to March 2026). The slides give ratings counts and repair progress by road manager; the repair tables follow the 2019 to 2023 inspection round.",
     "locator": "Slide on bridge ratings at the end of fiscal 2025, three columns 2018, 2023, 2025",
     "quote": "判定区分Ⅲ・Ⅳの橋梁は51,046橋 … 1巡目 69,051橋 (10%) … 2巡目 56,463橋 (8%) … 最新 51,046橋 (7%) … 約13万橋 約21万橋 約24万橋",
     "quote_en": "Bridges rated III or IV: 51,046 at the end of FY2025; 69,051 (10%) after the first round, 56,463 (8%) after the second; bridges more than 50 years old about 130,000, 210,000 and 240,000.",
     "screenshot": "evidence/screenshots/k1-1.png"
    }
   ]
  },
  {
   "id": "c-fall",
   "kind": "calculation",
   "summary": "Bridges rated early or urgent fell by 18,005, or 26%, from 69,051 (end of fiscal 2018) to 51,046 (end of fiscal 2025); tunnels rated early or urgent fell 32%, from 4,416 to 3,016.",
   "see_also": [],
   "scope": "",
   "code": "The code divides each 2025 count of flagged bridges and tunnels by the 2018 count and subtracts one.",
   "formula": "change = count at end of fiscal 2025 / count at end of fiscal 2018 - 1; bridges 51,046 / 69,051; tunnels 3,016 / 4,416",
   "depends_on": [
    "k1",
    "k2"
   ],
   "sources": [
    {
     "title": "橋梁等の2025年度（令和７年度）点検結果をとりまとめ ～道路メンテナンス年報（３巡目２年目）の公表～ (Results of the FY2025 inspections of bridges and other road structures, road maintenance annual report, third cycle year 2)",
     "issuer": "Ministry of Land, Infrastructure, Transport and Tourism, Road Bureau",
     "originator": "Ministry of Land, Infrastructure, Transport and Tourism, Road Bureau",
     "date": "2026-08-26",
     "url": "https://www.mlit.go.jp/report/press/content/002018446.pdf",
     "sha256": "cd8e4e9b002db3915e8b94076282183831e63caac21cd39eb635976095900a4e",
     "retrieved": "2026-11-22",
     "offline": "analysis/collection/japan-demographics/fetched-round-jrm2/originals/out/jrm-05.body",
     "s3": "s3://china-data-bulk-backup-229475225071/project-files-archive/analysis/collection/japan-demographics/fetched-round-jrm2/originals/out/jrm-05.body",
     "tier": "primary",
     "access": "firsthand",
     "retrieval": "read-in-archive",
     "capture": "original",
     "quote_lang": "ja",
     "assessment": "The ministry's own press release and attached slides announcing the annual road maintenance report for fiscal 2025 (to March 2026). The slides give ratings counts and repair progress by road manager; the repair tables follow the 2019 to 2023 inspection round.",
     "locator": "Slide on bridge ratings at the end of fiscal 2025, three columns 2018, 2023, 2025",
     "quote": "判定区分Ⅲ・Ⅳの橋梁は51,046橋 … 1巡目 69,051橋 (10%) … 2巡目 56,463橋 (8%) … 最新 51,046橋 (7%) … 約13万橋 約21万橋 約24万橋",
     "quote_en": "Bridges rated III or IV: 51,046 at the end of FY2025; 69,051 (10%) after the first round, 56,463 (8%) after the second; bridges more than 50 years old about 130,000, 210,000 and 240,000.",
     "screenshot": "evidence/screenshots/k1-1.png"
    },
    {
     "title": "橋梁等の2025年度（令和７年度）点検結果をとりまとめ ～道路メンテナンス年報（３巡目２年目）の公表～ (Results of the FY2025 inspections of bridges and other road structures, road maintenance annual report, third cycle year 2)",
     "issuer": "Ministry of Land, Infrastructure, Transport and Tourism, Road Bureau",
     "originator": "Ministry of Land, Infrastructure, Transport and Tourism, Road Bureau",
     "date": "2026-08-26",
     "url": "https://www.mlit.go.jp/report/press/content/002018446.pdf",
     "sha256": "cd8e4e9b002db3915e8b94076282183831e63caac21cd39eb635976095900a4e",
     "retrieved": "2026-11-22",
     "offline": "analysis/collection/japan-demographics/fetched-round-jrm2/originals/out/jrm-05.body",
     "s3": "s3://china-data-bulk-backup-229475225071/project-files-archive/analysis/collection/japan-demographics/fetched-round-jrm2/originals/out/jrm-05.body",
     "tier": "primary",
     "access": "firsthand",
     "retrieval": "read-in-archive",
     "capture": "original",
     "quote_lang": "ja",
     "assessment": "The ministry's own press release and attached slides announcing the annual road maintenance report for fiscal 2025 (to March 2026). The slides give ratings counts and repair progress by road manager; the repair tables follow the 2019 to 2023 inspection round.",
     "locator": "Slide on tunnel ratings at the end of fiscal 2025",
     "quote": "判定区分Ⅲ・Ⅳのトンネルは3,016箇所 … 4,416箇所 (41%) … 3,288箇所 (29%) … 約2,300箇所 約3,000箇所 約3,300箇所",
     "quote_en": "Tunnels rated III or IV: 3,016 at the end of FY2025; 4,416 (41%) and 3,288 (29%) at the end of the first and second rounds.",
     "screenshot": "evidence/screenshots/k2-1.png"
    }
   ]
  },
  {
   "id": "k3",
   "kind": "sourced",
   "summary": "Of 54,903 bridges rated early or urgent in the 2019 to 2023 inspections, work had started on 39,068 (71%), completed on 25,156 (46%) and not started on 15,835 (29%) at the end of fiscal 2025. Ministry-managed: 3,684 flagged, 91% started, 52% completed. Local governments: 48,494 flagged, 33,541 started (69%), 45% completed, 14,953 not started (31%). Cities, towns and villages: 31,587 flagged, 63% started, 37% not started.",
   "see_also": [],
   "scope": "",
   "sources": [
    {
     "title": "橋梁等の2025年度（令和７年度）点検結果をとりまとめ ～道路メンテナンス年報（３巡目２年目）の公表～ (Results of the FY2025 inspections of bridges and other road structures, road maintenance annual report, third cycle year 2)",
     "issuer": "Ministry of Land, Infrastructure, Transport and Tourism, Road Bureau",
     "originator": "Ministry of Land, Infrastructure, Transport and Tourism, Road Bureau",
     "date": "2026-08-26",
     "url": "https://www.mlit.go.jp/report/press/content/002018446.pdf",
     "sha256": "cd8e4e9b002db3915e8b94076282183831e63caac21cd39eb635976095900a4e",
     "retrieved": "2026-11-22",
     "offline": "analysis/collection/japan-demographics/fetched-round-jrm2/originals/out/jrm-05.body",
     "s3": "s3://china-data-bulk-backup-229475225071/project-files-archive/analysis/collection/japan-demographics/fetched-round-jrm2/originals/out/jrm-05.body",
     "tier": "primary",
     "access": "firsthand",
     "retrieval": "read-in-archive",
     "capture": "original",
     "quote_lang": "ja",
     "assessment": "The ministry's own press release and attached slides announcing the annual road maintenance report for fiscal 2025 (to March 2026). The slides give ratings counts and repair progress by road manager; the repair tables follow the 2019 to 2023 inspection round.",
     "locator": "Slide on repair progress, bridges rated III or IV in the second inspection round, table at the end of fiscal 2025",
     "quote": "措置が必要な施設数 54,903 … 着手済 39,068(71%) … 完了 25,156(46%) … 未着手 15,835(29%) … 地方公共団体 48,494 33,541(69%) … 国土交通省 3,684 3,370(91%) … 市区町村 31,587 19,888(63%) 11,699(37%)",
     "quote_en": "Bridges needing action 54,903; started 39,068 (71%); completed 25,156 (46%); not started 15,835 (29%); local governments 48,494, 33,541 started (69%); ministry 3,684, 3,370 started (91%); cities, towns and villages 31,587, 19,888 started (63%).",
     "screenshot": "evidence/screenshots/k3-1.png"
    }
   ]
  },
  {
   "id": "k9",
   "kind": "sourced",
   "summary": "Of the 1,348 bridges rated IV (urgent) since 2014, handling at the end of fiscal 2025 was repair or rebuilding for 649 (48%), undecided for 104 (8%) and removal or abolition for 44%, of which 316 (23%) were already removed from the managed stock; the ministry gives this split for category IV only; the repair and removal categories include work planned or under way as well as work done.",
   "see_also": [],
   "scope": "",
   "sources": [
    {
     "title": "道路メンテナンス年報 2026年8月 (Road maintenance annual report, August 2026, fiscal 2025 results)",
     "issuer": "Ministry of Land, Infrastructure, Transport and Tourism, Road Bureau",
     "originator": "Ministry of Land, Infrastructure, Transport and Tourism, Road Bureau",
     "date": "2026-08",
     "url": "https://www.mlit.go.jp/road/sisaku/yobohozen/pdf/r07/r07_08maint.pdf",
     "sha256": "8869c00245d63c3d594187ed2df9be242aaf2f5296daf34ceff265bba9ed5d63",
     "retrieved": "2026-11-22",
     "offline": "analysis/collection/japan-demographics/fetched-round-jrm4/originals/out/jrm-10.body",
     "s3": "s3://china-data-bulk-backup-229475225071/project-files-archive/analysis/collection/japan-demographics/fetched-round-jrm4/originals/out/jrm-10.body",
     "tier": "primary",
     "access": "firsthand",
     "retrieval": "read-in-archive",
     "capture": "original",
     "quote_lang": "ja",
     "assessment": "The ministry's full annual report for fiscal 2025 (to March 2026). Section 2(6) splits the handling of bridges rated IV, the urgent category, since 2014 into repair or rebuilding, function change, undecided, and removal or abolition.",
     "locator": "Section 2(6), bridges rated IV: handling at the end of fiscal 2025 (printed page 42, PDF page 46)",
     "quote": "判定区分Ⅳの橋梁 1,348橋 … 修繕・架替 48%(649) … 対応未定 8%(104) … 撤去・廃止 44% (廃止 20%(274)、撤去・廃止済 23%(316))",
     "quote_en": "Bridges rated IV, 1,348: repair or rebuilding 48% (649); undecided 8% (104); removal or abolition 44%, of which 20% (274) pending and 23% (316) already removed from management.",
     "screenshot": "evidence/screenshots/k9-1.png"
    }
   ]
  },
  {
   "id": "k5",
   "kind": "sourced",
   "summary": "Of 3,212 tunnels rated early or urgent in the 2019 to 2023 inspections, work had started on 2,564 (80%) and completed on 1,874 (58%) at the end of fiscal 2025; for ministry-managed tunnels 89% had started and for local governments 79%.",
   "see_also": [],
   "scope": "",
   "sources": [
    {
     "title": "橋梁等の2025年度（令和７年度）点検結果をとりまとめ ～道路メンテナンス年報（３巡目２年目）の公表～ (Results of the FY2025 inspections of bridges and other road structures, road maintenance annual report, third cycle year 2)",
     "issuer": "Ministry of Land, Infrastructure, Transport and Tourism, Road Bureau",
     "originator": "Ministry of Land, Infrastructure, Transport and Tourism, Road Bureau",
     "date": "2026-08-26",
     "url": "https://www.mlit.go.jp/report/press/content/002018446.pdf",
     "sha256": "cd8e4e9b002db3915e8b94076282183831e63caac21cd39eb635976095900a4e",
     "retrieved": "2026-11-22",
     "offline": "analysis/collection/japan-demographics/fetched-round-jrm2/originals/out/jrm-05.body",
     "s3": "s3://china-data-bulk-backup-229475225071/project-files-archive/analysis/collection/japan-demographics/fetched-round-jrm2/originals/out/jrm-05.body",
     "tier": "primary",
     "access": "firsthand",
     "retrieval": "read-in-archive",
     "capture": "original",
     "quote_lang": "ja",
     "assessment": "The ministry's own press release and attached slides announcing the annual road maintenance report for fiscal 2025 (to March 2026). The slides give ratings counts and repair progress by road manager; the repair tables follow the 2019 to 2023 inspection round.",
     "locator": "Slide on repair progress, tunnels rated III or IV in the second inspection round",
     "quote": "措置が必要な施設数 3,212 … 着手済 2,564(80%) … 完了 1,874(58%) … 国土交通省 89% … 地方公共団体 79%",
     "quote_en": "Tunnels needing action 3,212; 2,564 started (80%); 1,874 completed (58%); ministry 89% started; local governments 79%.",
     "screenshot": "evidence/screenshots/k5-1.png"
    }
   ]
  },
  {
   "id": "k10",
   "kind": "sourced",
   "summary": "Of 455,101 bridges rated I or II in the 2015 to 2019 inspections and not repaired in between, 3% were rated III or IV at their inspection five years later (2020 to 2024); for tunnels the share was 15%.",
   "see_also": [],
   "scope": "",
   "sources": [
    {
     "title": "道路メンテナンス年報 2025年8月 (Road maintenance annual report, August 2025, fiscal 2024 results)",
     "issuer": "Ministry of Land, Infrastructure, Transport and Tourism, Road Bureau",
     "originator": "Ministry of Land, Infrastructure, Transport and Tourism, Road Bureau",
     "date": "2025-08",
     "url": "https://www.mlit.go.jp/road/sisaku/yobohozen/pdf/r06/r06_08maint.pdf",
     "sha256": "08a4e88d3c3f2616ade93554b671124f44df491332c0fa1879dd60d2377c1a92",
     "retrieved": "2026-11-22",
     "offline": "analysis/collection/japan-demographics/fetched-round-jrm1/originals/out/jrm-02.body",
     "s3": "s3://china-data-bulk-backup-229475225071/project-files-archive/analysis/collection/japan-demographics/fetched-round-jrm1/originals/out/jrm-02.body",
     "tier": "primary",
     "access": "firsthand",
     "retrieval": "read-in-archive",
     "capture": "original",
     "quote_lang": "ja",
     "assessment": "The ministry's annual report for fiscal 2024 (to March 2025). Section 2(2) follows bridges and tunnels rated I or II in the 2015 to 2019 inspections to their 2020 to 2024 inspections without repair in between.",
     "locator": "Section 2(2), transition of bridges and tunnels rated I or II to III or IV after five years (printed pages 14 and 15, PDF pages 18 and 19)",
     "quote": "修繕等の措置を講じないまま、５年後の2020～2024年度の点検において … 区分Ⅲ・Ⅳへ遷移した橋梁の割合は全道路管理者合計で3% … トンネルの割合は … 15%",
     "quote_en": "Of bridges rated I or II in 2015 to 2019 and not repaired, 3% were rated III or IV at their 2020 to 2024 inspection five years later (455,101 bridges); for tunnels the share was 15%.",
     "screenshot": "evidence/screenshots/k10-1.png"
    }
   ]
  },
  {
   "id": "k4",
   "kind": "sourced",
   "summary": "The ministry says bridges rated III or IV should be dealt with before the next inspection, within five years, and that about two in ten flagged local-government bridges had no work started although five years or more had passed since inspection (the release does not give the count behind that proportion); for the 2020 inspections, work had started on 79% of local-government bridges rated III or IV.",
   "see_also": [],
   "scope": "",
   "sources": [
    {
     "title": "橋梁等の2025年度（令和７年度）点検結果をとりまとめ ～道路メンテナンス年報（３巡目２年目）の公表～ (Results of the FY2025 inspections of bridges and other road structures, road maintenance annual report, third cycle year 2)",
     "issuer": "Ministry of Land, Infrastructure, Transport and Tourism, Road Bureau",
     "originator": "Ministry of Land, Infrastructure, Transport and Tourism, Road Bureau",
     "date": "2026-08-26",
     "url": "https://www.mlit.go.jp/report/press/content/002018446.pdf",
     "sha256": "cd8e4e9b002db3915e8b94076282183831e63caac21cd39eb635976095900a4e",
     "retrieved": "2026-11-22",
     "offline": "analysis/collection/japan-demographics/fetched-round-jrm2/originals/out/jrm-05.body",
     "s3": "s3://china-data-bulk-backup-229475225071/project-files-archive/analysis/collection/japan-demographics/fetched-round-jrm2/originals/out/jrm-05.body",
     "tier": "primary",
     "access": "firsthand",
     "retrieval": "read-in-archive",
     "capture": "original",
     "quote_lang": "ja",
     "assessment": "The ministry's own press release and attached slides announcing the annual road maintenance report for fiscal 2025 (to March 2026). The slides give ratings counts and repair progress by road manager; the repair tables follow the 2019 to 2023 inspection round.",
     "locator": "Main points 3 on page 1; note under the repair table on page 6",
     "quote": "判定区分Ⅲ・Ⅳである橋梁は次回点検まで（５年以内）に措置を講ずるべき … 2020年度点検 … 着手率は79％ … ５年以上経過していても措置に着手できていない橋梁は約２割ある",
     "quote_en": "Bridges rated III or IV should be dealt with by the next inspection, within five years; for the 2020 inspections local governments' start rate was 79%; about two in ten bridges had no work started after five years or more.",
     "screenshot": "evidence/screenshots/k4-1.png"
    }
   ]
  },
  {
   "id": "k7",
   "kind": "sourced",
   "summary": "By the end of fiscal 2025, 1,733 of 1,788 local governments (97%) were considering consolidating, removing or downsizing road structures, and 124 were supported by the maintenance subsidy for this in 2025.",
   "see_also": [],
   "scope": "",
   "sources": [
    {
     "title": "橋梁等の2025年度（令和７年度）点検結果をとりまとめ ～道路メンテナンス年報（３巡目２年目）の公表～ (Results of the FY2025 inspections of bridges and other road structures, road maintenance annual report, third cycle year 2)",
     "issuer": "Ministry of Land, Infrastructure, Transport and Tourism, Road Bureau",
     "originator": "Ministry of Land, Infrastructure, Transport and Tourism, Road Bureau",
     "date": "2026-08-26",
     "url": "https://www.mlit.go.jp/report/press/content/002018446.pdf",
     "sha256": "cd8e4e9b002db3915e8b94076282183831e63caac21cd39eb635976095900a4e",
     "retrieved": "2026-11-22",
     "offline": "analysis/collection/japan-demographics/fetched-round-jrm2/originals/out/jrm-05.body",
     "s3": "s3://china-data-bulk-backup-229475225071/project-files-archive/analysis/collection/japan-demographics/fetched-round-jrm2/originals/out/jrm-05.body",
     "tier": "primary",
     "access": "firsthand",
     "retrieval": "read-in-archive",
     "capture": "original",
     "quote_lang": "ja",
     "assessment": "The ministry's own press release and attached slides announcing the annual road maintenance report for fiscal 2025 (to March 2026). The slides give ratings counts and repair progress by road manager; the repair tables follow the 2019 to 2023 inspection round.",
     "locator": "Slide on consolidation and removal by local governments",
     "quote": "検討状況は、2025年度末時点で97%となっている … 2025年度は124団体を支援",
     "quote_en": "97% of local governments were considering consolidation, removal or downsizing at the end of FY2025; 124 bodies were supported in FY2025.",
     "screenshot": "evidence/screenshots/k7-1.png"
    }
   ]
  },
  {
   "id": "k8",
   "kind": "sourced",
   "summary": "For bridges rated III or IV in 2021, local governments had started work on 69% and completed 44% at the end of fiscal 2025; the ministry's expected pace for that year's inspections was 80% by then and 100% for inspections five years on.",
   "see_also": [],
   "scope": "",
   "sources": [
    {
     "title": "橋梁等の2025年度（令和７年度）点検結果をとりまとめ ～道路メンテナンス年報（３巡目２年目）の公表～ (Results of the FY2025 inspections of bridges and other road structures, road maintenance annual report, third cycle year 2)",
     "issuer": "Ministry of Land, Infrastructure, Transport and Tourism, Road Bureau",
     "originator": "Ministry of Land, Infrastructure, Transport and Tourism, Road Bureau",
     "date": "2026-08-26",
     "url": "https://www.mlit.go.jp/report/press/content/002018446.pdf",
     "sha256": "cd8e4e9b002db3915e8b94076282183831e63caac21cd39eb635976095900a4e",
     "retrieved": "2026-11-22",
     "offline": "analysis/collection/japan-demographics/fetched-round-jrm2/originals/out/jrm-05.body",
     "s3": "s3://china-data-bulk-backup-229475225071/project-files-archive/analysis/collection/japan-demographics/fetched-round-jrm2/originals/out/jrm-05.body",
     "tier": "primary",
     "access": "firsthand",
     "retrieval": "read-in-archive",
     "capture": "original",
     "quote_lang": "ja",
     "assessment": "The ministry's own press release and attached slides announcing the annual road maintenance report for fiscal 2025 (to March 2026). The slides give ratings counts and repair progress by road manager; the repair tables follow the 2019 to 2023 inspection round.",
     "locator": "Repair table, local governments, inspection year 2021; footnote on expected pace",
     "quote": "地方公共団体 2021 44% 69% … 想定されるペース … 2020年度点検実施（5年経過）：100％、2021年度点検実施（4年経過）：80％",
     "quote_en": "Local governments, 2021 inspections: 69% started, 44% completed; expected pace 80% at four years, 100% at five.",
     "screenshot": "evidence/screenshots/k8-1.png"
    }
   ]
  }
 ]
}
